تطبيق ملاط جبس الديكور و طلاء الطبقة الاخيرة
Decorative topcoat is applied after a drying period of 7 days after application of the plaster mortar.
Teknosistem Mineral Textured Decorative Plaster is applied on the surface with trowel (Figure 1).
A plastic trowel is passed over the surface to form a texture before it dries (Figure 2).
Finally, exterior wall lining and painting is applied (Figure 3).